Thursday, September 29, 2016

650-127 CGE Authorized Connected Grid Engineer Knowledge Verification

Exam Number 650-127
Duration 60 minutes (55-60 questions)
Available Languages English

This exam will test the knowledge of system engineers and field engineers regarding the features, functions, design, and planning for deployment of the Cisco Connected Grid technology solution. There will be a focus on the features and benefits of the Cisco 2010 Connected Grid Router (CGR 2010) and the Cisco 2500 Series Connected Grid Switch (CGS 2500). The solution deployment planning will include design, configuration, implementation, and integration.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Introduction to Cisco Connected Grid Go-to-Market and Product Positioning
How to Sell
Cisco Connected Grid Ordering and Support
Cisco 2010 Connected Grid Router (CGR) Product Overview
Cisco 2500 Connected Grid Switch (CGS) Product Overview
Cisco Connected Grid Solutions


QUESTION 1
Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC
B. CGS-2520-16S-8PC
C. All CGS models
D. None of the modelsupportsPOE

Answer: C

Explanation:


QUESTION 2
Which of the following is not a supported PDI Help Desk function?

A. design and configuration support
B. technical product question
C. implementation questions and support
D. On site support
E. RFP review

Answer: D

Explanation:


QUESTION 3
Which function is available on the Cisco Series 2500 Connected Grid Switch?

A. EnergyWise
B. inputs and outputs for alarms
C. GRWIC modules
D. StackWise

Answer: C

Explanation:

Wednesday, September 28, 2016

650-082 MITSE Mobile Internet Technology for System Engineers

Exam Number 650-082
Duration 60 minutes (55-65 questions)
Available Languages English

This exam will test System Engineer's knowledge of features, functions and design of the Cisco ASR 5000 mobile internet solution. There will be a focus on design and planning for deployment. Candidates should prepare for this exam by taking the Mobile Internet Technology for Account Managers course as the MIT SE exam covers content from both the AM and SE training courses.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Describe ASR 5000 Hardware and Software
Describe Understanding the StarOS Command Line Interface (CLI)
Describe Software Licensing and Upgrade
Describe ASR 5000 Core services for GPRS/UMTS - SGSN and GGSN Functionalities
Describe the Design and Implementation of xGSN
Describe Billing & Policy
Describe Statistics and Alarms
Describe Services Overview
Describe the Design and Implementation of LTE


QUESTION 1
What Cisco ASR 5000 services are needed for communication between a Serving Gateway and
Packet Data Network Gateway?

A. EGTP and GTPU
B. GTPU and PGW
C. SGW and GTPU
D. EGTP and SGW

Answer: B


QUESTION 2
Which option helps to define activities that are needed to successfully deploy and operate Cisco
technologies?

A. Smart Services
B. Cisco lifecycle Services
C. TAC
D. Cisco Technical Services

Answer: A


QUESTION 3
Which card has the resources to run multiple services?

A. system management card
B. switch processor I/O card
C. packet service card
D. redundant crossbar card

Answer: C

Sunday, September 25, 2016

650-059 LCSARS Lifecycle Services Advanced Routing and Switching

Exam Number 650-059
Duration 60 minutes (45-55 Questions)
Available Languages English and Japanese
Register Pearson VUE

The 650-059 LCSARS Lifecycle Services Advanced Routing and Switching exam tests a candidate's knowledge and skills for the Cisco Lifecycle Services approach to help successfully sell, deploy, and support Cisco technologies and optimize their performance. Candidates can prepare for this exam by taking the LCSARS Lifecycle Services Advanced Routing and Switching course.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Describe the value of Cisco Lifecycle Services for Advanced Routing & Switching
Identify the phases of the Cisco Lifecycle Services for Advanced Routing & Switching
Identify the value of the Cisco Lifecycle Services for Advanced Routing & Switching
Describe the value of the service components included in the Prepare phase
Describe the value of the service components included in the Plan phase
Describe the value of the service components included in the Design phase
Describe the value of the service components included in the Implement phase
Describe the value of the service components in the Operate phase
Describe the value of the Service Component in the Optimize phase

Describe the value of the activities in each phase of the Cisco Lifecycle Services approach
Describe the value of the activities included in the Prepare phase
Describe the value of the activities included in the Plan phase
Describe the value of the activities included in the Design phase
Describe the value of the activities in the Implement phase
Describe the value of the activities included in the Operate phase
Describe the value of the activities included in the Optimize phase


QUESTION 1
Which two of these activities comprise the problem management service component in the operat
phase? (choose two.)

A. send a replacement module
B. schedule a maintenance window
C. manage the problem
D. identify the problem
E. confirm roles and responsibilities

Answer: C,D


QUESTION 2
Identify a customer support model for the solution is an activity thet is part of which service
component in the plan phase?

A. operations readiness assessment
B. planning project kickoff (deployment project management)
C. operations plan development
D. system requirements validation

Answer: A


QUESTION 3
Which three of these service components are included in the optimize phase? (choose three.)

A. change management
B. security administration
C. technology assessment
D. operations assessment
E. operations readiness assessment
F. security assessment

Answer: C,D,F

Thursday, September 22, 2016

Exam 70-981 Recertification for MCSE: Private Cloud

Published: August 13, 2014
Languages: English, Japanese
Audiences: IT professionals
Technology: Windows Server 2012
Credit toward certification: MCP, MCSE

Skills measured
This exam measures your ability to accomplish the technical tasks listed below. View video tutorials about the variety of question types on Microsoft exams.

Please note that the questions may test on, but will not be limited to, the topics described in the bulleted text.

Do you have feedback about the relevance of the skills measured on this exam? Please send Microsoft your comments. All feedback will be reviewed and incorporated as appropriate while still maintaining the validity and reliability of the certification process. Note that Microsoft will not respond directly to your feedback. We appreciate your input in ensuring the quality of the Microsoft Certification program.

If you have concerns about specific questions on this exam, please submit an exam challenge.

If you have other questions or feedback about Microsoft Certification exams or about the certification program, registration, or promotions, please contact your Regional Service Center.

Configure data center process automation
Implement workflows
Implement SCO Runbook automation; automate remediation of incidents, including resolution of System Center Virtual Machine‒based incidents; design and build end-to-end automation, incorporating System Center 2012 technologies; implement change control and problem resolution workflows
Implement service offerings
Add a new service offering to the service catalog, create a custom workflow using the Service Manager console, reference Orchestrator workflows in Service Manager, implement self-service provisioning of virtual machines

Deploy resource monitoring
Deploy end-to-end monitoring
Deploy agents, discover and deploy network device monitoring, import and configure management packs, deploy and configure monitoring of a heterogeneous virtualization infrastructure
Configure end-to-end monitoring
Configure overrides, create synthetic transactions, configure Outside-In monitoring, configure application performance monitoring (APM), create distributed application models, integrate the monitoring infrastructure with Global Service Monitor (GSM)
Create monitoring reports and dashboards
Implement service-level tracking; implement reports, including chargeback reports and System Center Manager data warehouse reports; implement dashboards

Configure and maintain service management
Implement service level management
Define service level objectives (SLOs) and service level agreements (SLAs); implement SLA management and escalation; maintain SLAs, including planning for future growth; analyze SLAs (reporting)
Manage problems and incidents
Customize problem management, link incidents to problems, and resolve problems; raise, assign, and resolve incidents; perform root cause analysis/diagnosis; integrate problem and incident resolution with change management; create and manage a knowledge base
Manage cloud resources
Deploy new applications to private and public clouds; deploy virtual machine (VM)/service (applications, SQL, roles), deploy multi-tier applications by using service templates, manage applications in private and public clouds, manage VM hardware (CPUs, dynamic memory), manage self service

Configure the fabric
Configure the storage fabric
Classification and pools, providers, arrays, file server cluster, storage pools, file shares
Configure the network fabric
Logical networks; VM networks; IP/MAC resource pools; VIP templates; load balancing; logical switches; network isolation, including network virtualization with Windows Server Gateway; private VLANs and VLANs
Configure and manage the deployment and update servers
Integrate a Windows Server Update Services (WSUS) server into the Virtual Machine Manager fabric; configure and manage a library server; integrate Windows Deployment Services (WDS)/PXE into the Virtual Machine Manager fabric, including virtualization host deployment using Windows Deployment Services (WDS)
Configure clouds and virtualization hosts
Clouds and host groups, configure and deploy virtualization hosts

Configure System Center integration
Configure private cloud integration
Configure Operations Manager connectors; Orchestrator integration packs; Service Manager connectors; SharePoint integration; configure IP Address Management (IPAM) server integration, configure AppController
Configure integration of private and public clouds
Configure Service Provider Framework (SPF), configure Windows Azure Pack for Windows Server
QUESTION 1
You need to implement a solution to meet the IM requirements for the help desk users.
What should you do?

A. Install Unified Communications Managed API 3.0 Runtime on LON-SM1.
B. Install the Lync 2010 client on LON-SM1.
C. Create a Service Manager workflow.
D. Create an IM channel.

Answer: B

Explanation:
Ref: http://technet.microsoft.com/en-us/library/hh495482.aspx

QUESTION 2
You need to implement the alert notifications. The solution must meet the technical requirements. A Lync Server administrator enables an account named ADATUM\IMUser for Unified Communications. What should you do next?

A. Configure ADATUM\IMUser as a Run As Account. Install the Lync Management Pack. Create a notification subscriber and an IM channel.
B. Create a mailbox for the ADATUM\IMUser account Install the Exchange Server Management Pack. Create a notification subscriber and an SMTP channel.
C. Create a mailbox for the ADATUM\IMUser account. Install Microsoft Visual C++ 2008 Runtime. Create a notification subscriber and an SMTP channel.
D. Configure ADATUM\IMUser as a Run As Account. Install Unified Communications
Managed API 3.0 Runtime. Create a notification subscriber and an IM channel.

Answer: D

QUESTION 3
You need to recommend a solution to remediate the Exchange Server 2010 service failures. The solution must meet the technical requirements.
What should you include in the recommendation?

A. Create a service request workflow that triggers a dependent activity.
B. Create an incident event workflow that triggers a dependent activity.
C. Create an incident event workflow that triggers a runbook activity.
D. Create a service request workflow that triggers a runbook activity.

Answer: C

QUESTION 4
You need to recommend a solution to meet the monitoring requirements for App2.
What should you include in the recommendation? (More than one answer choice may achieve the goal. Select the BEST answer.)

A. An aggregate rollup monitor
B. A distributed application
C. A dependency rollup monitor
D. Service monitors

Answer: B

QUESTION 5
You need to recommend a solution to ensure that the sales department managers can create instances of App1 in Cloud1.
What should you include in the recommendation?

A. A subscription in App Controller and a task in Service Manager
B. A dashboard in Operations Manager and a distributed application
C. A task in Operations Manager and a distributed application
D. A service offering in Service Manager and a runbook in Orchestrator

Answer: D

Tuesday, September 20, 2016

650-032 MITAM Mobile Internet Technology for Account Managers


QUESTION 1
Which two features are benefits of CDMA? (Choose two)

A. Rich VPN features
B. Fully standard complaint
C. Requirements of ANSI-41 GSM MAP conversion mode
D. Application transparency
E. Extensive QOS functionality

Answer: C,D


QUESTION 2
Which feature allows the MITG to provide industry-leading reliability?

A. ECS
B. ICSR
C. ATCS
D. Packet service card

Answer: B


QUESTION 3
Which company offers seamless migration to 4G?

A. Nokia Siemens Network
B. Cisco
C. Ericson
D. Huawei

Answer: B

Thursday, September 15, 2016

648-238 CCPS1 Implementing Cisco Connected Physical Security 1 Exam

Exam Number 648-238 CCPS1
Duration 90 minutes (75-85 questions)
Available Languages English, Japanese
Register Pearson VUE

This exam tests the Sales and Field Engineer's knowledge of the Cisco IP Video Surveillance solution. Candidates will be tested on basics of digital video, hardware and software components of the Cisco VSM solution, configuration and design of IP Video Surveillance. Candidates can prepare for this exam by taking the Cisco IPVS course offered by Cisco Advance Services Education.

The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Exam Topics
VSM components
Describing video codecs, resolutions, protocols
Video traffic flow and design for efficient bandwidth utilization
Describing the Hardware - servers, storage, end-points
Platform configuration
End-point configuration
Application configuration
Managing roles, events, and reports
Best practices, maintenance, and troubleshooting


QUESTION 1
Order the following resolutions, by pixel count, from lowest to highest.

A. D1, HD, QCIF, CIF
B. D1, CIF, 4CIF, HD
C. QCIF, CIF, D1, HD
D. QCIF, D1, CIF, HD

Answer: C

Explanation:


QUESTION 2
What are the two differences between interlaced and progressive scan video? (Choose two.)

A. Progressive scan video is generally better with fast-moving objects
B. Interlaced video is generally better with fast-moving objects
C. Interlaced video is constructed out of alternating odd and even lines
D. Progressive scan video is constructed out of alternating odd and even lines

Answer: A,C

Explanation:


QUESTION 3
Where should outdoor surveillance cameras be mounted when nearby sources of light are
present?

A. The camera should be mounted lower than the light source.
B. The camera should be mounted in parallel with the nearest light source.
C. The camera should be mounted above the light source.
D. Location does not matter, as long as the camera is day/night capable.

Answer: A

Explanation:


QUESTION 4
What is the correct camera and lens setup for the use of IR lighting?

A. Color camera with IR corrected lens
B. A camera with day/night mode and IR corrected lens
C. A camera with day/night mode and varifocal lens
D. Color camera with varifocal lens

Answer: B

Explanation:


QUESTION 5
Which switch port capability is recommended for an MSP server?

A. Server switch ports should have 10/100 Mb capability
B. Server switch ports should have 1000 Mb capability
C. Server switch ports should have 10 Gb capability
D. Servers should be connected to PoE-capable switches

Answer: B

Explanation:

Sunday, September 11, 2016

642-999 DCUCI Implementing Cisco Data Center Unified Computing

Exam Number 642-999 DCUCI
Associated Certifications CCNP Data Center
Cisco Data Center Unified Computing Support Specialist
Duration 90 minutes (65-75 questions)
Available Languages English

This exam tests a candidate's knowledge of implementing Cisco Data Center Unified Computing. Concepts like setup of the computing environment in a standalone and rack-mountable configuration, provisioning of storage resources, backup, management functions and deployment of a virtualized environment are covered by this exam.

The 642-999 DCUCI Implementing Cisco Data Center Unified Computing exam is associated with the CCNP® DC certification and with the Cisco Unified Computing Support Specialist. This 90-minute, 65−75 question exam tests a candidate's knowledge of implementing Cisco Data Center Unified Computing. Concepts like setup of the computing environment in a standalone and rack-mountable configuration, provisioning of storage resources, backup, management functions and deployment of a virtualized environment are covered by this exam. The exam is closed book and no outside reference materials are allowed.

The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

1.0 Implement C-Series Standalone 9%
1.1 Implement UCS C-Series rack servers
1.2 Implement firmware updates
1.3 Configure CIMC
1.4 Configure network and storage connectivity
1.5 Provision hard drives
1.6 Install ESXI on local hard drives
1.7 Configure logging and monitoring the methods for Cisco UCS

2.0 Configure Cisco UCS B-Series Connectivity 35%
2.1 Configure B-Series overall connectivity
2.2 Implement UCS B-Series component installation
2.3 Configure B-Series LAN connectivity
2.4 Configure B-Series SAN connectivity

3.0 Manage Cisco UCS B-Series 18%
3.1 Implement security in a Cisco UCS
3.2 Identify the steps necessary to manage software and firmware versions and upgrades in a Cisco UCS
3.3 Implement backup and import for Cisco UCS database
3.4 Configure logging and monitoring the methods for Cisco UCS
3.5 Configure the Call Home feature in a Cisco UCS system
3.6 Describe high availability for the fabric interconnect cluster

4.0 Provision Cisco UCS Compute Resources 12%
4.1 Provision network connectivity in a Cisco UCS
4.2 Provision storage sources in a Cisco UCS
4.3 Provision resource pools in a Cisco UCS
4.4 Provision resource policies in a Cisco UCS
4.5 Provision service profiles in a Cisco UCS
4.6 Provision O/S parameters in a Cisco UCS
4.7 Provision the base UCS system configuration
4.8 Provision virtual HBAs
4.9 Provision VNICs and VNIC policies in a Cisco UCS
4.10 Provision C-Series integration

5.0 Implement Cisco UCS Server Virtualization Features 26%
5.1 Provision UCS integration with Vmware vCenter server
5.2 Provision UCS vm-fex
5.3 Provision direct path I/O

QUESTION 1
Which three items must be configured in the Port Profile Client in Cisco Unified Computing System Manager? (Choose three.)

A. port profile
B. DVS
C. data center
D. folder
E. VMware vCenter IP address
F. VM port group

Answer: B,C,D


QUESTION 2
When configuring roles in the Cisco UCS C-Series, which role should be assigned for a person who must be allowed to power on the server and install a hypervisor using virtual media, but not allowed to configure other Cisco Integrated Management Controller settings?

A. read-only
B. user
C. VM admin
D. admin

Answer: B

QUESTION 3
Which three components perform the port extension functions for a Cisco UCS domain? (Choose three.)

A. the multiprotocol port on the Cisco storage
B. the Device Manager in Cisco Prime Data Center Network Manager
C. the Cisco UCS 2208XP IOMs
D. the Cisco UCS Manager
E. the Cisco Nexus 2232PP FEX
F. the Cisco UCS VIC adapter that has VM-FEX and Adapter FEX technology

Answer: A,C,D


QUESTION 4
Which of the following is true with respect to hardware failover or NIC teaming within a Cisco Unified Computing System?

A. Hardware failover is specified by the operating system.
B. An uplink failure when using automatic pinning requires that hardware failover for the server vNIC be disabled.
C. NIC teaming is controlled by the vNIC.
D. The hardware failover option that is available for Ethernet does not affect Fibre Channel traffic.

Answer: D


QUESTION 5
While configuring communication between vCenter and Cisco UCS, which two items are contained in the extension file? (Choose two.)

A. extension key
B. plug-in version information
C. SSL private certificate
D. Cisco UCS Manager SSL public certificate
E. SSH public key
F. Cisco UCS Manager admin credentials
G. IP address of the hosts utilizing VM link
H. vCenter SSL public certificate

Answer: A,D